A complex oak frame new build in Cambridge

It’s been a blowy and wet winter so far so it was with trepidation that we closely monitored the long range weather forecast in the weeks before our latest raising on the outskirts of Cambridge. Well, we needn’t have worried as the wind piped down to the merest feathery rustle and the rain clouds dissipated repectfully overnight to be replaced with crisp, clear and sunny skies. Perfect.

Jake, Sylvain, Adam and I packed our toothbrushes, lucky underpants, tool belts and tape measures, piled into the pickup and headed East. Then we headed East some more until finally the A14 ran out of tarmac and we reached our destination in the Cambridgeshire fens

Normally we shack up in some more or less serviceable B & B but this time Rob pushed the boat out and practically hired a stately home for 2 nights! Valet parking and four poster beds would not have been out of place at Madingley Hall – check it out here to see the kind of accommodation that Rob lays on for his team.

Madingly1
 
Madingly3
 
 

Even managed to cram in some fly fishing and wild boar hunting with enough time for a cooked breafast before an early start on site at 7.30am.

Oak frame for a new build

The frame we were erecting for James and Christine makes up 2 parts of a complex newbuild with essentially two asymmetric wings connected by a tall fully vaulted oak link and walkway, which itself changes angle at the mid point. Sounds confusing? You try building it!

We began with the easy bit, the roof structure to one of the wings, comprising 4 x raised collar trusses with purlins, ridge, windbracing and wallplate. So far so good and by 11am we were enjoying a well earned break.

 
Break
 

The truss feet (principal rafters) were unusually designed to fit directly onto padstones in the blockwork wall.

 
 
padstones
 

Although our structural engineer stipulated supplementary metalwork within the collar joint to resist the added tension forces.

 
timberframe tension forces
 

After this point things started to get more complicated as we assembled and lifted into place the 2 massive trusses that defined the link space. Once these had been braced and supported with “scabbing” (any timbers that are used to temporarily stabilize a frame) we were able to install the connecting walkway posts and rails and finally secure the roof with the purlins and ridge. Phew!

By 4.30 pm we were able to send the crane home and retire to Madingley Hall for a freshen up before some Castle Ring Oak Frame team bonding in Cambridge. Ended up in the Pint Shop which was recommended by John the builder – you might be impressed (or not) that the drinks menu included about 80 types of gin.

Wednesday morning was again a biffer of a day and we enjoyed pegging up the frame, fixing down the ridges and purlins and tidying up before piling back into the truck back to Wales.

Thank you Cambridge!

 

Here’s a selection of photographs of the project from workshop to raising.

 

Castle Ring Oak Frame
Castle Ring Oak Frame

Do you want a quick quote?
Or to discuss your project?

If you're considering an oak framed building (or larch, or douglas fir), let's talk. We'll gladly put together an outline quote (completely free, with no strings attached). And we need very little information from you to do so.
Equally, we're always here, at the end of the phone, to talk through your ideas.

castleringoakframe@gmail.com 07828 819149
Castlering Wood, Beggars Bush, Evenjobb, Powys, LD8 2PB