Project Summary
Brief
- Supply only king post trusses to engineer’s specification
- Stainless steel fixing through tie-beam
Timings
- Workshop – one week
A softwood timber frame developer from Yorkshire required four king post trusses along with some feature oak purlins to go into a new dwelling. The project had stalled and progress on the roof couldn’t proceed without them.
A softwood timber frame developer from Yorkshire required four king post trusses along with some feature oak purlins to go into a new dwelling. The project had stalled and progress on the roof couldn’t proceed without them.
They provided the engineered drawings to Castle Ring and the trusses were made and delivered (assembled at the request of the developer) within 3 weeks.
Brief
Timings
If you're considering an oak framed building (or larch, or douglas fir), let's talk. We'll gladly put together an outline quote (completely free, with no strings attached). And we need very little information from you to do so.
Equally, we're always here, at the end of the phone, to talk through your ideas.